Description: Our Infrastructure team will be performing configuration changes to the location's host infrastructure within the maintenance window. These works are required in preparation for infrastructure capacity expansion at this location.
Risk: Due to the nature of the works, we are classifying this period as 'at risk'.
Impact: Low. While the work is expected to be non-disruptive, some users may notice brief network inturuptions and/or virtual machine pauses during the works.
Action required: We advise all users to ensure a backup of their virtual machines and data is taken prior to the maintenance window and on a regular basis.
Posted Feb 14, 2024 - 14:43 UTC
This scheduled maintenance affected: Data centres (se-smedjebacken-1).